01
Decide early, build once
Stone slabs, appliance specs and lighting layouts were locked before rough-in, which removed the change orders that usually appear at drywall.
New construction · Atherton, Silicon Valley · 2025
A ground-up house is a thousand decisions in sequence. Our role was to hold the interior language steady from foundation drawings through the final light switch.

The brief
The approach
01
Stone slabs, appliance specs and lighting layouts were locked before rough-in, which removed the change orders that usually appear at drywall.
02
The entry, stair and great room read as one connected volume, so the scale of the house is felt immediately and then quiets down.
03
A twenty-foot sliding wall dissolves the great room into the terrace, with the same stone running inside and out.
04
Site walks, a live open-items list and fortnightly cost reporting kept the schedule and the budget visible to everyone at once.
Renderings





Materials
The outcome
“Every question we expected to be asked at the last minute had already been answered a year earlier.”
Next step
Ninety minutes in your home to talk through scope, sequencing and budget. No cost, no obligation.